Food & beverage
Load and route scheduling for a national beverage bottler
A national beverage bottler planned its daily loads and routes on spreadsheets and the know-how of a few planners. Plans were slow to build, hard to change on the day, and lived outside the ERP.
- Industry
- Food & beverage
- Location
- South Africa
- Stages
- Plan → Deliver
- Setup
- Around their ERP
A load and route scheduling module (Plan stage of the order-to-delivery spine) that plugs into the existing ERP, giving planners one place to build, adjust and share the day's loads.
By Thijan Dippenaar, General Manager · Published
The problem
A national beverage bottler planned its daily loads and routes on spreadsheets and the know-how of a few planners.
Plans were slow to build, hard to change on the day, and lived outside the ERP.
What we built
- A load and route scheduling module (Plan stage of the order-to-delivery spine) that plugs into the existing ERP, giving planners one place to build, adjust and share the day's loads.
A load and route scheduling module (Plan stage of the order-to-delivery spine) that plugs into the existing ERP, giving planners one place to build, adjust and share the day's loads.
- ERP orders
- Hubble load & route scheduling
- Dispatch
What improved
- The day's loads and routes are built in one place, not across spreadsheets.
- Planning no longer depends on the know-how of a few planners.
- Plans change on the day without starting over.
- Every vehicle's day — loading, travel, depot time and return — is visible at a glance.
Questions
Does it replace the ERP?
No. It takes orders and data from the ERP, builds the schedule, and keeps the ERP as the system of record.
Can planners change the plan on the day?
Yes. Loads can be moved between vehicles and the schedule regenerated without rebuilding it by hand.
A straight 30-minute conversation about your operation.
A straight 30-minute conversation about your operation.
Start a conversation